Gepland onderhoud in uitvoering

Systeemstatus

Realtime monitoring van alle DeluxHost-infrastructuur en -diensten.

Alle systemen operationeel
100%Uptimeafgelopen 30 dagen
4Locaties4 online
21/21Bewaakte dienstenover alle producten
ZojuistLaatste updateautomatisch vernieuwd

Huidige status

Diensten

21/21 operationeel
VPSVirtual private servers
Operationeel99.56% uptime
Plus VPSHigh-performance virtual private servers
Operationeel99.56% uptime
VDSVirtual dedicated servers
Operationeel99.56% uptime
Plus VDSPremium virtual dedicated servers
Operationeel99.56% uptime
StorageCloud storage solutions
Operationeel100% uptime
OfferPromotional offer nodes
Operationeel99.56% uptime
Dedicated ServersBare metal dedicated servers
Operationeel100% uptime
Game ServersOptimized game server hosting
Operationeel100% uptime
Web HostingManaged web hosting
Operationeel100% uptime
Control PanelServer management panel
Operationeel100% uptime
Billing PanelBilling and subscription management
Operationeel100% uptime
APIREST API & integrations
Operationeel100% uptime
DNSDomain name servers
Operationeel100% uptime
DDoS ProtectionNetwork protection layer
Operationeel100% uptime
NetworkCore network infrastructure
Operationeel100% uptime
NikhefAmsterdam, NL
Operationeel100% uptime
Qupra DC1Amsterdam, NL
Operationeel100% uptime
iNTERWERKFrankfurt, DE
Operationeel100% uptime
SkyLink DatacenterEygelshoven, NL
Operationeel100% uptime
Dedicated Management PanelDedicated server portal
Operationeel100% uptime
deluxhost.netMain website
Operationeel100% uptime

Infrastructuur

Netwerklocaties

nkf
Operationeel

Nikhef

Amsterdam, NL

Gem. latentie

1ms

ams
Operationeel

Qupra DC1

Amsterdam, NL

Gem. latentie

2ms

eyg
Operationeel

Eygelshoven

Eygelshoven, NL

Gem. latentie

6ms

fra
Operationeel

Frankfurt

Frankfurt, DE

Gem. latentie

2ms

Incidentgeschiedenis

Recente incidenten

Scheduled Maintenance – Gradual Migration to New NVMe Infrastructure
GeplandOffer

Start

May 31, 2026 · 22:00 UTC

Einde

July 4, 2026 · 22:00 UTC

22:00 UTC

We would like to inform you that starting June 1st, we will begin the scheduled migration of services to our new NVMe Ceph infrastructure. This upgrade is designed to permanently resolve the stability issues previously caused by brief network interruptions, which in some cases required manual server reboots to restore normal connectivity. To ensure maximum data safety and avoid any risk of corruption or data loss, each server will be migrated individually rather than all at once. During the migration process, the affected server will be properly suspended before the transfer begins, preventing unintended startups and protecting disk integrity. Each individual migration will require approximately 5 to 10 minutes of downtime per server. This gradual approach allows us to guarantee a safer transition while significantly improving long-term platform stability, storage performance, and overall service reliability. If you would prefer to schedule the migration of your server for a specific day or time, please feel free to contact us and we will do our best to accommodate your request. We appreciate your patience and understanding during this infrastructure improvement.

Service Interruption Notice – DC Power Outage
OpgelostVPS, Plus VPS, VDS, Plus VDS, Offer (E-01, E-02, M-01, M-02, F-01, F-02, X-01, X-02, N-01, N-02, Y-01, Y-02, V-01, V-02, K-01, K-02, J-01, J-02, I-01, I-02, H-01, H-02, G-01, G-02, C-01, C-02, B-01, B-02, L-01, L-02, R-01, R-02, A-01, A-02, Z-01, Z-02, T-01, T-02)

April 1, 2026

23:36 UTC

09:00 UTC

We fully understand the impact this is having on your services and business. A compensation plan will be applied automatically once the incident is resolved. We sincerely apologize for the disruption and will continue to provide regular updates until full recovery.

06:15 UTC

We are currently experiencing a major outage caused by a critical power failure at our data center provider. This issue is outside of our direct control, but we are actively working with the facility engineers, who are already on-site, to restore power and bring all systems back online safely. At this time, services have been offline for several hours. Recovery is in progress, but full restoration is taking longer than expected due to the nature of the incident. What we are doing: • Coordinating directly with the data center emergency response team • Monitoring hardware integrity during power restoration • Gradually bringing systems back online to avoid further issues

23:36 UTC

Stiamo rilevando un'interruzione che colpisce le VPS/VDS standard e Plus presso il datacenter QUPRA DC1 e numerose offerte.

Datacenter Migration – February 18, 2026
OpgelostVPS, Plus VPS, VDS, Plus VDS, Offer (E-01, E-02, M-01, M-02, F-01, F-02, X-01, X-02, N-01, N-02, Y-01, Y-02, V-01, V-02, K-01, K-02, J-01, J-02, I-01, I-02, H-01, H-02, G-01, G-02, C-01, C-02, B-01, B-02, L-01, L-02, R-01, R-02, A-01, A-02, Z-01, Z-02, T-01, T-02)

February 18, 2026

05:30 UTC

22:20 UTC

Today we completed the infrastructure migration at our Amsterdam location. During the operation, a temporary downtime occurred at this location as part of the planned maintenance activities. While reconnecting the servers to the network, some connectivity issues were encountered. Our team worked promptly to resolve them, and the situation is now stabilized in the vast majority of cases. Virtual machines are currently starting up progressively. If any service is still unreachable, it is likely still in the boot process.

05:30 UTC

The scheduled maintenance window has begun. Our team is now proceeding with the infrastructure migration at the Amsterdam datacenter. Services affected by this maintenance are currently being taken offline progressively. We will provide further updates as the operation progresses.

09:00 UTC

We would like to inform you that a scheduled maintenance window has been planned for February 18, 2026. Scheduled window: February 18, 2026 — 06:30 to 23:20 CET Estimated duration: 16 hours 50 minutes During this period, the following services will be temporarily unavailable: VPS, Plus VPS, VDS, Plus VPS, and selected Offer plans (all except W and D). This maintenance involves a full infrastructure migration at our Amsterdam datacenter location. The operation is necessary to upgrade our infrastructure and improve long-term reliability and performance. What to expect: • Services will be progressively brought offline at the start of the window • Our team will be monitoring the migration in real time • Status updates will be posted here throughout the process We apologize for any inconvenience this may cause and thank you for your understanding.

Prestaties

90-daagse uptime-geschiedenis

MarAprMayJun
VPS
99.56%
Plus VPS
99.56%
VDS
99.56%
Plus VDS
99.56%
Storage
100%
Offer
99.56%
Dedicated Servers
100%
Game Servers
100%
Web Hosting
100%
Control Panel
100%
Billing Panel
100%
API
100%
DNS
100%
DDoS Protection
100%
Network
100%
Nikhef
100%
Qupra DC1
100%
iNTERWERK
100%
SkyLink Datacenter
100%
Dedicated Management Panel
100%
deluxhost.net
100%
90 dagen geledenVandaag

DeluxHost, opgericht in 2023, biedt hoogwaardige hostingoplossingen voor diverse digitale behoeften. Wij bieden gedeelde hosting, VPS en dedicated servers met geavanceerde beveiliging en wereldwijde datacenters.

© DeluxHost, Alle rechten voorbehouden. | BTW-nummer: IT17734661006
Alle systemen operationeel